Commercial Solar Installation Northern Beaches
One local team for Commercial solar installation across the Northern Beaches. Licensed, Insured and SAA-accredited, serving homes and businesses from Manly to Palm Beach.
Our Trusted Partners
What Sets Us Apart
Why Northern Beaches Customers Choose Us
In-House Team, Start to Finish
We handle panels, batteries, inverters and Level 2 electrical work ourselves, so one accountable team manages your whole installation.
Owner-Led Site Visits
Kieran Garside personally inspects most Northern Beaches roofs himself, backed by over 10 years installing coastal-ready solar systems.
Genuine Commitment to Quality
Every system is held to the standard Kieran would want on his own roof, no shortcuts, no cut corners, ever.
Fully Licensed & SAA-Accredited
We're licensed, insured and Solar Accreditation Australia registered, covering you from your first site visit through to system activation.
Competitive Quotes, No Surprises
Every quote lists equipment, warranty terms and accreditation clearly upfront, so there's nothing to renegotiate once work begins.
10+ Years of Local Coastal Experience
We've designed around Northern Beaches roofs, councils and weather for over ten years, so your system suits our region.
Commercial Solar Installation on the Northern Beaches: Everything Your Business Needs to Know
Commercial solar installation on the Northern Beaches is the design and fit-out of a grid-connected solar power system for a business premises, handled start to finish by Power & Solar Group's in-house, Solar Accreditation Australia. Businesses typically achieve full payback within three to five years through energy savings and NSW government incentives.
At Power & Solar Group we walk local business owners through every stage of that process, from the first energy audit to grid connection, so the finished system suits the property and the operation running out of it.
Kieran Garside and our in-house team have spent over a decade on Northern Beaches roofs.
What We Help With
Power & Solar Group handles every stage of a commercial solar installation on the Northern Beaches under one roof:
Energy audits and site assessment, using your actual consumption data to size a system properly before we quote
Rooftop and ground-mounted PV design, matched to your roof's structure, orientation and shading
Battery storage integration, from a single Tesla Powerwall through to modular commercial storage at scale
Three-phase electrical work and Ausgrid grid connection, carried out by our own Level 2 accredited electricians
Monitoring and tariff optimisation, so you can see real performance and manage demand billing
Ongoing maintenance, including inverter health checks and monitoring reviews
Solar Savings Calculator
Discover the ideal solar system size for your Northern Beaches home
Tell us about your home
Your energy usage & goals
Your Solar Recommendation
⚠️ Estimates are indicative only. Actual system size, cost, and savings vary based on your specific roof, usage patterns, local tariffs, and current market pricing. STC rebates are subject to change. Always obtain quotes from Clean Energy Council accredited installers.
Understanding Commercial Solar Systems
Commercial solar systems are photovoltaic installations built for business premises, not homes, and at Power & Solar Group we design them to handle everything from an office rooftop to a full industrial site. Northern Beaches Council figures put around 32,000 commercial operations across the area, accounting for roughly 43% of the region's municipal electricity emissions, so cutting cost and carbon footprint through solar is a real, local opportunity, not a theoretical one.
The gap between a commercial and a residential system goes well beyond size, though size is the first thing people notice. A home system typically runs 5 to 10 kW, while a commercial solar system usually starts at 10 to 20 kW and scales into the megawatt range for sites such as manufacturing plants and logistics facilities. Complexity climbs too: commercial installs need a structural load assessment across bigger roof spans, plus fire, glare and shading studies across multiple roof planes, work we handle as standard. Most businesses run on three-phase power with demand-rate billing, unlike flat-rate residential metering, and permitting is more rigorous, with council approval, Ausgrid's embedded generation rules and AS/NZS compliance adding steps that need real trade experience.
Licensed electrical contractors are required for this work, which is why we keep it in-house rather than handing connections to a subcontractor. Our Level 2 accredited electricians manage the meter and mains connection directly, so one accountable, fully licensed team carries the job start to finish, backed by our Solar Accreditation Australia accreditation.
A commercial solar power system is built from several parts, each matched to the building's energy profile and how the business operates. We fit higher wattage panels, typically 400 to 550 W and often mono-PERC or bifacial, to get the most energy from every square metre of roof, which matters on buildings with varied rooflines. Inverters convert that power into usable electricity, and depending on roof shape and shading we specify string, central or micro inverters, with three-phase units handling the bigger commercial loads. Monitoring is not optional on a commercial job: it drives tariff optimisation, demand billing and export control, and lets you see real performance rather than take our word for it. Grid connection gear, including switchgear and bi-directional metering, has to comply with AS/NZS 4777 and Ausgrid's ES1 rules, and we match every component properly, because a mismatched system is where reliability and savings fall away.

Solar Installers Who Know the Northern Beaches
Our team doesn't just work near the coast, we're based here, which matters when a roof in Mona Vale behaves differently to one in Narrabeen or Warriewood. Beyond the Brookvale industrial precinct, Manly's hospitality strip and the Dee Why commercial corridor, we regularly quote and install across Warriewood, Mona Vale, French's Forest and Narrabeen, and we understand how each local council area handles planning and grid connection. That local knowledge, backed by our Solar Accreditation Australia accreditation, means fewer surprises during approval and a system genuinely built for Northern Beaches weather.

Northern Beaches Commercial Solar Opportunities
The Northern Beaches offers some of the strongest conditions in Sydney for commercial solar investment, thanks to local energy demand, expanding incentives and genuinely good sun.
Businesses across the Northern Beaches, from hospitality venues in Manly to industrial operations in Brookvale, share a similar energy profile of heavy daytime use from HVAC, refrigeration, lighting and equipment. Solar lowers those costs because it generates power when those loads peak, and the standard Monday to Friday, 7am to 6pm trading pattern most local businesses run on lines up almost perfectly with peak generation. Brookvale alone carries around 2 MWp of installed solar across roughly 7,000 panels, with room to scale past 20 MWp if half the suitable rooftops were used, showing genuine untapped momentum.
Federal and state incentives for commercial solar are expanding. Eligible systems get support through Australia's Small-scale Renewable Energy Scheme, with Small-scale Technology Certificates cutting a meaningful amount off your upfront cost, on top of these state-level solar incentives:
- NSW's Batteries for Businesses scheme starts 1 September 2026, cutting 30 to 40% off battery costs with new solar
- BESS4 covers 20 to 200 kWh for smaller operations, BESS5 covers 200 kWh to 10 MWh for larger sites
- SoAR-Boost grants cover up to 80% of costs, to $200,000 excluding GST, until 4 December 2026
- NSW feed-in tariffs for 2026-27 sit low, 3.4 to 6.5 cents per kWh, favouring self-consumption over exporting
Northern Beaches roofs genuinely suit solar. The coastal Northern Sydney climate zone delivers strong, consistent sun across the year, and much of the commercial roof stock in Brookvale and Dee Why is flat or low pitch with little shading, close to ideal for a rooftop array. Council figures show residential solar uptake at around 28% of homes, reflecting how good the local resource is.
Local Climate & Sun Exposure
Commercial Solar Installation Process
The commercial solar installation process runs through a set sequence, refined at Power & Solar Group over a decade of Northern Beaches roofs, to keep timelines tight without cutting corners on compliance.
- an initial consultation gathering your energy use, demand profile and operating patterns
- a roof structural assessment checking load capacity, orientation and compliance
- an electrical infrastructure review covering service capacity, meter type and switchboard constraints
- consumption analysis using historical bills to map peak demand and load-shifting
- preliminary system sizing matching generation to consumption, plus battery sizing if included
From there we design the system that suits your property and energy profile, rather than default to one standard package. The main system types differ mainly in scale and resilience:
- rooftop PV only, 20 to 1,000 kW, suits flat commercial roofs wanting lower cost and simpler approvals
- PV plus battery storage, 50 kW to several megawatts, smooths peak demand and adds backup where resilience matters
- hybrid inverter systems suit small to medium sites wanting integrated solar and battery control
- ground-mounted arrays, at megawatt scale, suit land-rich sites needing maximum capacity and orientation
Installation and grid connection is where the physical work happens, and on a typical medium project of 100 to 200 kW here, the whole process runs four to eight weeks:
- planning and energy audit: usage data, site, structural and electrical assessment
- design and engineering: layout, inverter selection and performance modelling
- permits and approvals: council permits and Ausgrid's generation sign-off
- procurement: panels, inverters, mounting hardware and protection gear
- installation: mounting, wiring, structural work and battery install where included
- inspection and testing: electrical inspection and the compliance certificate
- grid connection and metering: final agreement and system energisation, at which point the system is switched on and generating
Bluecurrent Metering Authorised Contractor
Solar Accreditation Australia
S7727563
5419
Company Licence
Accreditations & Licences
20865
A050314
ACRS Master Cabler
340040C
Ausgrid Authorised Contractor
ASP Company Number
We hold the licences and industry accreditations that matter for solar and electrical safety compliance, so every job we do is fully compliant and backed by recognised industry bodies.
3589626
Accreditations & Licences
We hold the licences and industry accreditations that matter for solar and electrical safety compliance, so every job we do is fully compliant and backed by recognised industry bodies.
Company Licence
340040C
ACRS Master Cabler
A050314
Bluecurrent Metering Authorised Contractor
20865
Ausgrid Authorised Contractor
3589626
ASP Company Number
5419
Solar Accreditation Australia
S7727563
Common Challenges and Solutions
Every commercial solar project on the Northern Beaches runs into some version of the same three challenges, and we have a fix for each, built from years on local roofs.
Complex Roof Configurations
Commercial buildings often carry roof obstructions, skylights, HVAC plant, multiple levels and mixed pitch angles, handled with flexible mounting and microinverters or power optimisers so partial shading does not drag the system down. We map shading properly during the site assessment, and where the roof genuinely will not work, we look at solar canopies or a ground-mounted array instead. Exporting large volumes of excess solar can hit grid constraints anyway, so every system we design prioritises on-site consumption first, regardless of roof complexity.
Grid Connection Delays
Ausgrid approval delays almost always come down to incomplete applications or unclear inverter specs, not the system itself, so we submit complete documentation from the start and engage accredited installers early. Systems up to 30 kW, or 10 kW per phase, usually qualify for streamlined approval, and for larger systems we lodge preliminary enquiries and build realistic timeframes in. Ausgrid is also consolidating its Model Standing Offers into simplified Basic and Standard categories through 2026, which should make approval easier for standard systems.
Upfront Costs
The upfront cost of a commercial system is a genuine business decision, so we help clients work through what is available: STC rebates, the NSW Batteries for Businesses program, and finance including solar leases, green loans and power purchase agreements. The real lever on returns is designing for high self-consumption, 70 to 90% or higher, over chasing export credits.

The Trusted Choice
Why Northern Beaches Businesses Choose Power & Solar Group
We're a fully licensed, Solar Accreditation Australia accredited solar and electrical specialist based on the Northern Beaches, led by Kieran Garside, who still gets on roofs himself. Every quote, design and install carries his own standard for safety and craftsmanship, because the person setting the direction has actually done the work. Our in-house Level 2 accredited electricians handle the meter and mains connection directly on every job, so there's one accountable team from quote to switch-on, not a subcontractor handoff partway through.
That combination of local roof knowledge, in-house electrical accreditation and straight, plain-English advice is why Northern Beaches businesses come to us for commercial solar installation rather than a national franchise quoting from a spreadsheet. Our credentials, including Master Licence 340040C and Solar Accreditation Australia Accredited – S7727563, back up every claim we make about the standard of our work, and we're happy to walk you through them before you commit to anything.
Ready to Make the Switch?
Next Steps
Commercial solar installation on the Northern Beaches is one of the more financially sound moves a local business can make: strong sun, real incentives, and a proven three to five year payback, often faster. Whether you run a shop in Manly, a warehouse in Brookvale or a practice in Dee Why, a properly designed system keeps working for your bottom line long after the trucks leave.
Here is where we would suggest starting, in order:
01
Book a proper energy audit with Kieran and the team, a no-obligation look at your use and load profile.
02
Ask for a detailed proposal covering PV capacity, optional battery storage and projected savings from your own data.
03
Review financing, including STC rebates, the Batteries for Businesses incentive, green loans, leases and PPAs.
04
Map out your project timeline, including the Ausgrid approval pathway and a realistic install schedule.
Additional Resources
A few places worth checking once you are comparing numbers on a Northern Beaches commercial solar installation:
Australia's Small-scale Renewable Energy Scheme, to check your STC eligibility and system discount.
The NSW Batteries for Businesses program, BESS4 and BESS5, launching September 2026.
SoAR-Boost grants for strata and multi-unit buildings, open until 4 December 2026.
IPART's 2026-27 feed-in tariff benchmarks, the 3.4 to 6.5 cents per kWh behind our self-consumption advice.
AS/NZS 4777 and Ausgrid's ES1 requirements, the standards any installer must meet.
What Locals Are Saying
Reviews from Real Customers
We’ve just had solar panels, battery and a gateway installed by Kieran and the team and we would highly recommend them. They are friendly, professional, and turned up on time. They were also very helpful with information about providers and apps and will continue to monitor down the track. The installation looks great, and the quality of their work is excellent.
Great team led by Kieran who installed a new PV + battery along with a three phase upgrade to support a planned EV charger. Fast turnaround , excellent quality of work, and great communication over the course of scoping and execution. Can recommend Kieran and the team at Power & Solar Group.
Brilliant work installing a Battery and more Solar Panels. Really impressive attention to detail, great service including visiting the site before even estimating the job, and then a really competitive price, and great service and hard work to do a really high quality install. Overall highly recommended!
We highly recommend Kieran and his team who very efficiently, cleanly and cheerfully installed solar over some extremely hot days! They never complained! Every effort was made to ensure installation of the panels and the battery was totally balanced and symmetrical. The job was completed quickly and they left our property spotless! They are like ninjas! We are very grateful for their amazing service and professionalism!
Kieran and his team installed 15kW of Solar and 32kWh battery. All work was carried out professionally and within the timeframe nominated. What I really like about Kieran and his team is they actually did what they said and committed to do. Overall a great experience.
Kieren and his team are a 6-star outfit. They provided a proven solution that met our requirements to the letter. Over a 3-day install in 30-degree heat, they worked hard, got it right first time, and delivered on schedule. What impressed me most was the sheer proficiency - everything done with ease and efficiency, polite and clear communication at every stage. Can be trusted to deliver a high standard at a competitive rate. Highly recommend.
FAQs About Commercial Solar Installation on the Northern Beaches
How much does commercial solar installation cost on the Northern Beaches?
Cost depends on system size, roof complexity and whether battery storage is included, but most businesses recover their upfront cost within three to five years through energy savings. One Northern Beaches childcare centre spent a net $21,800 after STC rebates on a 20 kW system and now saves roughly $14,500 a year, paying the system off in eighteen months. Getting an accurate figure means running a proper energy audit against your actual consumption data, which is where we always start.
How long does commercial solar installation take on the Northern Beaches?
For a typical small to medium commercial system under 200 kW, the process runs four to eight weeks from approval to grid connection, covering planning, design, permits, installation and Ausgrid's final sign-off. Larger systems over 1 MW, or projects needing network augmentation, can take eight to sixteen weeks or more. We build buffer time into every schedule for Ausgrid's assessment period so businesses aren't caught out by a delay outside our control.
Is Power & Solar Group licensed to install commercial solar systems?
Yes. We're fully licensed and Clean Energy Council accredited, and our in-house Level 2 accredited electricians handle the meter and mains connection directly rather than subcontracting that work out. This matters for commercial solar specifically because installations require licensed electrical contractors to meet AS/NZS compliance standards, and keeping the whole job in-house means one accountable team carries responsibility from quote to switch-on.
What size commercial solar system does a Northern Beaches business need?
It depends entirely on your daytime energy use, not a general rule of thumb. Commercial systems generally start at 10 to 20 kW for a small office and scale into the megawatt range for industrial sites, but the right size for your business comes from matching generation to your actual consumption profile during a proper energy audit. Businesses with high daytime HVAC, refrigeration or equipment loads typically see the strongest returns from a well-sized system.
What government incentives are available for commercial solar on the Northern Beaches in 2026?
Businesses can access federal Small-scale Technology Certificates through Australia's Small-scale Renewable Energy Scheme, plus NSW's Batteries for Businesses program launching 1 September 2026, which cuts 30 to 40% off battery costs when paired with new solar. Strata and multi-unit commercial buildings can also apply for SoAR-Boost grants covering up to 80% of eligible costs, to a cap of $200,000 excluding GST, with applications open until 4 December 2026.
